• TSX-V:AUAU$0.58
  • OTCQX:AUXXF$0.42
  • FRA:RR7€0.36
All operations

Asset 03 · East Africa

Geita

Tanzania · Gold

The portfolio's highest stated producer, reported with the lowest stated all-in sustaining cost among the sites.

Gold production

380,000 oz

2025, as stated in the company report

All-in sustaining cost

US$1,050/oz

2025, company-stated

Primary focus

Gold

East Africa

Operating profile

How the site fits the portfolio

Geita is the largest individually stated producer in the current site dataset and the only site with a separately stated all-in sustaining cost. The company describes both underground and open-pit activity.

Geita acts as the principal disclosed production and cost benchmark for the operating portfolio, while the group headline remains the more complete measure of total performance.

Portfolio highlights

  • Largest stated contributor in the Africa region
  • Company-stated AISC of US$1,050/oz
  • Underground and open-pit operations

Development priorities

Disciplined value creation

  1. 01Protect production continuity across underground and open-pit areas
  2. 02Track sustaining capital and operating inputs against the stated cost base
  3. 03Prioritise reserve replacement and brownfield drilling subject to technical evidence

Commercial context

From operation to market

Its stated scale makes operating reliability and cost discipline commercially significant. Site-level realised pricing, sustaining-capital detail and sales contracts have not been published.

This section provides cautious portfolio context. It does not constitute an offer, forecast, confirmed sale, booking or operating commitment.

Disclosure status

Records still required

These items are not in the published source material and must be confirmed before independent reliance.

  • Ownership interest and operator statusPending
  • Site Mineral Resource and ReservePending
  • Mine life, throughput and metallurgical recoveryPending
  • AISC reconciliation and sustaining-capital breakdownPending

Figures are company-provided and drawn from the 2025 annual report. Ownership, permits and reserves require supporting documents before independent reliance.